Posted on May 20, 2010

Our camera at Brighton and Hove Albion’s new Falmer Stadium has been moved into the stands to better observe the work. As this is a long way from the nearest power source, we have designed and built a customised fuel cell power system, which powers the unit safely, quietly and reliably. This unit only needs refuelling every three months.