Siemens VAI

Posted on June 27, 2010

As part of our ongoing work for Siemens VAI, we installed a fourth camera in China - this time at a plant in Xipeng, Chongqing province. We were able to use this installation to reposition one of our two cameras in Changsa.

Read more

Foster+Partners

Posted on June 23, 2010

We have installed the first fully-cellular Lobster Pot Extreme for Foster + Partners. The location is confidential for now, we hope to be able to reveal this when the project is complete.

Read more

Tower Block Demolition, London

Posted on June 11, 2010

We installed a camera in a tower block - to watch its neighbour block being demolished over a few months. Client: DDS demolition.
Tower block demolition in progress, London

Read more

Tate Mini

Posted on June 11, 2010

As part of the Transforming Tate Modern project we’re covering, we have installed a camera on the scale-model version of the work being constructed in East London. Client: Mace.

Read more

Tate Modern Display, London

Posted on June 09, 2010

To showcase their new extension, Tate Modern have built an HD projection system that shows footage from their Lobster Pot camera. There's also a dedicated Lobster Vision kiosk there. Go visit now! We've also been commissioned to place a camera on the 6m architectural model of the extension being built. The latest image and video is also available here...

Read more

BAM Nuttall

Posted on June 03, 2010

We have installed a camera in London for BAM Nuttall, monitoring and filming a major rail project.

Read more

Centre Point reposition, London

Posted on June 01, 2010

Our camera for Transport for London, which was based inside Centre Point, London, has now been moved outside to cover excavations.

Read more

Habshan, UAE

Posted on May 30, 2010

We put up our fourth camera for a client in the UAE. Once again, air conditioned, solar powered, 21 megapixel, tested for 50°C heat - this time with a cellular connection.

Read more

Brighton and Hove FC

Posted on May 20, 2010

Our camera at Brighton and Hove Albion’s new Falmer Stadium has been moved into the stands to better observe the work. As this is a long way from the nearest power source, we have designed and built a customised fuel cell power system, which powers the unit safely, quietly and reliably. This unit only needs refuelling every three months....

Read more

Brighton and Hove Albion FC

Posted on May 15, 2010

We moved the camera we have at Brighton and Hove Albion's new stadium build at Falmer. The camera is here. We've deployed an amazing fuel-cell system, so the camera runs on methanol.

Methanol Fuel-Cell powered Lobster Pot system, Falmer, UK.

Read more